国产亚洲欧美精品手机在线_中文字幕在线观看亚洲日韩_国内外成人免费在线观看_久久无码一区二区三区_美女人体艺术摄影写真_91尤物无码不卡在线_性欧美14一18最强性少妇_青青青在线视频精品_深夜放纵内射少妇_在线观看成人大片

山東創(chuàng)杰智慧裝備科技有限公司

18563723072
0534-5670558

山東創(chuàng)杰智慧快速發(fā)展,業(yè)績(jī)突出,涉及煤礦機(jī)械、石油機(jī)械、工程機(jī)械、化工機(jī)械、壓力容器、風(fēng)電、核電、專(zhuān)用車(chē)、汽車(chē)、客車(chē)、造船行業(yè)等,近年來(lái)在新能源客車(chē)噴粉領(lǐng)域取得優(yōu)異的成績(jī)

查看更多+

 公司團(tuán)隊(duì)專(zhuān)注于整廠表面處理、涂裝、環(huán)保設(shè)備的研發(fā),如噴漆房、烘干房、打磨房、噴砂房、拋丸房、焊煙除塵設(shè)備、鑄造除塵除廢氣設(shè)備、布袋除塵器、濾筒除塵器、旋風(fēng)除塵器、VOCs廢氣處理設(shè)備、沸石轉(zhuǎn)輪+RCO、沸石轉(zhuǎn)輪+RTO、活性炭吸附脫附+催化燃燒設(shè)備、噴漆線(xiàn)、噴粉線(xiàn)、電泳線(xiàn)、前處理線(xiàn)、涂裝線(xiàn)、自動(dòng)涂裝線(xiàn)等環(huán)保設(shè)備交鑰匙工程。

查看更多+
電泳線(xiàn)-電泳涂裝生產(chǎn)線(xiàn)使用注意什么?
來(lái)源:http://computerguide.cn/ 發(fā)布時(shí)間:2023-12-13

一、在涂裝生產(chǎn)線(xiàn)上安裝或懸掛涂漆物品時(shí)要小心。為了保證浸涂時(shí)工件放置在好的位置,我們?cè)O(shè)計(jì)了通過(guò)試浸提前在涂裝生產(chǎn)線(xiàn)上附著吊具和物體的方法。被涂物體的大表面應(yīng)接近垂直,其他表面應(yīng)與水平面成10°至40°角,以便殘留油漆順利地從被涂表面流出。

1、 Be careful when installing or hanging painted items on the painting production line. In order to ensure that the workpiece is placed in a good position during immersion coating, we have designed a method of attaching lifting tools and objects on the coating production line in advance through trial immersion. The large surface of the object to be coated should be close to vertical, and other surfaces should be at an angle of 10 ° to 40 ° to the horizontal plane, so that residual paint can flow out smoothly from the surface to be coated.

二、必須對(duì)浸漆罐進(jìn)行保護(hù),防止油漆生產(chǎn)線(xiàn)上涂漆時(shí)溶劑擴(kuò)散到工作場(chǎng)所和灰塵落入漆罐。

2、 The paint immersion tank must be protected to prevent solvent diffusion to the workplace and dust from falling into the tank during painting on the paint production line.

三、油漆生產(chǎn)線(xiàn)上對(duì)大件進(jìn)行浸涂后,溶劑基本揮發(fā)掉,然后送至烘干室。

3、 After immersion coating on large parts on the paint production line, the solvent basically evaporates and is then sent to the drying room.

四、涂裝時(shí)應(yīng)經(jīng)常注意測(cè)量涂料的粘度,每班測(cè)粘度一至兩次,如果粘度增加超過(guò)原粘度的10%以上,需及時(shí)添加溶劑。添加溶劑時(shí)停止浸漬操作。攪拌均勻后,測(cè)量粘度后再進(jìn)行。

4、 When painting, attention should be paid to measuring the viscosity of the coating regularly. Measure the viscosity once or twice per shift. If the viscosity increases by more than 10% of the original viscosity, solvent should be added in a timely manner. Stop the impregnation operation when adding solvent. After stirring evenly, measure the viscosity before proceeding.

五、涂膜的厚度主要由涂裝生產(chǎn)線(xiàn)上物體的升降速度和涂裝液的粘度決定。按上述要求控制好漆液粘度后,涂料生產(chǎn)線(xiàn)應(yīng)根據(jù)涂膜z高速度30um左右,根據(jù)不同設(shè)備通過(guò)實(shí)驗(yàn)確定合適的拉速。以此速度均勻地提升涂漆物體。如果牽引速度快,涂層就會(huì)?。蝗绻麪恳俣嚷?,涂層就會(huì)厚且不均勻。

5、 The thickness of the coating film is mainly determined by the lifting speed of objects on the coating production line and the viscosity of the coating liquid. After controlling the viscosity of the paint according to the above requirements, the paint production line should determine the appropriate pulling speed through experiments based on the high speed of the coating film, which is about 30um. Evenly lift the painted object at this speed. If the traction speed is fast, the coating will be thin; If the traction speed is slow, the coating will be thick and uneven.

浙江優(yōu)邁-電泳線(xiàn)-1

六、在油漆生產(chǎn)線(xiàn)上進(jìn)行浸涂時(shí),涂漆區(qū)域和底部區(qū)域的漆膜厚度可能不同,并且在被涂物體的底部邊緣上可能沉積特別厚的層。為了提高油漆的裝飾質(zhì)量,可以用刷子或使用離心力或靜電抽吸裝置手動(dòng)去除在浸漬過(guò)程中積累的多余漆滴。

6、 When dip coating is carried out on the paint production line, the paint film thickness of the painting area and the bottom area may be different, and a particularly thick layer may deposit on the bottom edge of the coated object. In order to improve the decorative quality of paint, excess paint droplets accumulated during the impregnation process can be manually removed using brushes or centrifugal force or electrostatic suction devices.

七、在涂裝生產(chǎn)線(xiàn)中浸泡木質(zhì)件時(shí),注意時(shí)間不要太長(zhǎng),以免木材吸收多余的油漆,減慢干燥速度,造成浪費(fèi)。

7、 When soaking wooden parts in the painting production line, be careful not to take too long to prevent the wood from absorbing excess paint, slowing down the drying speed, and causing waste.

八、防止溶劑蒸氣的損害,加強(qiáng)通風(fēng)設(shè)備,采取防火措施,定期檢查涂料生產(chǎn)線(xiàn)。

8、 Prevent damage from solvent vapors, strengthen ventilation equipment, take fire prevention measures, and regularly inspect paint production lines.

上一篇:車(chē)間焊接煙塵除塵器的選擇要注意什么?
下一篇:涂裝生產(chǎn)線(xiàn)設(shè)備結(jié)構(gòu)特點(diǎn)介紹

  • 服務(wù)熱線(xiàn): 18563723072
  • 官方微信