国产亚洲欧美精品手机在线_中文字幕在线观看亚洲日韩_国内外成人免费在线观看_久久无码一区二区三区_美女人体艺术摄影写真_91尤物无码不卡在线_性欧美14一18最强性少妇_青青青在线视频精品_深夜放纵内射少妇_在线观看成人大片

山東創(chuàng)杰智慧裝備科技有限公司

18563723072
0534-5670558

山東創(chuàng)杰智慧快速發(fā)展,業(yè)績突出,涉及煤礦機械、石油機械、工程機械、化工機械、壓力容器、風電、核電、專用車、汽車、客車、造船行業(yè)等,近年來在新能源客車噴粉領(lǐng)域取得優(yōu)異的成績

查看更多+

 公司團隊專注于整廠表面處理、涂裝、環(huán)保設(shè)備的研發(fā),如噴漆房、烘干房、打磨房、噴砂房、拋丸房、焊煙除塵設(shè)備、鑄造除塵除廢氣設(shè)備、布袋除塵器、濾筒除塵器、旋風除塵器、VOCs廢氣處理設(shè)備、沸石轉(zhuǎn)輪+RCO、沸石轉(zhuǎn)輪+RTO、活性炭吸附脫附+催化燃燒設(shè)備、噴漆線、噴粉線、電泳線、前處理線、涂裝線、自動涂裝線等環(huán)保設(shè)備交鑰匙工程。

查看更多+
工廠車間整體除塵設(shè)備的日常維護保養(yǎng)
來源:http://computerguide.cn/ 發(fā)布時間:2023-07-19
1、技術(shù)人員應(yīng)了解車間整體除塵設(shè)備的基本原理,特性,應(yīng)用標準,并熟練掌握調(diào)整和維修方式。
1. Technicians should understand the basic principles, characteristics, application standards, and proficiently master the adjustment and maintenance methods of the overall dust removal equipment in the workshop.
2、減速機,輸灰裝置等分子熱運動構(gòu)件應(yīng)按規(guī)定加油和換油,發(fā)覺有異常情況應(yīng)及時排除。
2. The reducer, ash conveying device and other molecular Thermal motion components shall be refueled and replaced as required, and any abnormal condition shall be eliminated in time.
3、儲氣罐,氣源三聯(lián)件中的油水分離器應(yīng)每組排污一次,同時油水分離器應(yīng)每間隔3~6月清理一次,油霧器應(yīng)時常查驗存油狀況,及時給油。
3. The oil water separator in the air storage tank and air source triplet should be drained once per group, and the oil water separator should be cleaned every 3-6 months. The oil mist collector should regularly check the oil storage status and provide oil in a timely manner.
4、電磁脈沖閥如出現(xiàn)故障,應(yīng)及時地排除,如內(nèi)部有殘渣,水份,應(yīng)完成清除,如膜片損壞應(yīng)及時拆換。
4. In case of fault of Electromagnetic pulse valve, it shall be removed in time. If there is residue and moisture inside, it shall be removed. If the diaphragm is damaged, it shall be removed and replaced in time.
5、應(yīng)用按時式清灰控制板,應(yīng)定時測量清灰周期是不是準確,不然應(yīng)做好調(diào)整。應(yīng)用定阻式脈沖控制儀,應(yīng)按時檢查壓力開關(guān)的工作情況,測壓口是不是阻塞,并完成清除。
5. When using a timely ash cleaning control board, it is necessary to regularly measure whether the ash cleaning cycle is accurate, otherwise adjustments should be made. When using a constant resistance pulse control instrument, the working condition of the pressure switch should be checked on time, the pressure tap should be checked for blockage, and the removal should be completed.
6、按時測量工藝主要參數(shù),如煙塵量,溫度,濃度值等,出現(xiàn)異常,應(yīng)找到根本原因并妥善處理。
6. Measure the main parameters of the process on time, such as smoke and dust amount, temperature, concentration value, etc. If any abnormalities occur, the root cause should be found and properly handled.
車間整體除塵設(shè)備
7、啟動時,應(yīng)先接入壓縮空氣至儲氣罐,接入操縱電源,運行排灰裝置,假如系統(tǒng)中還有其他設(shè)備,應(yīng)先運行下游設(shè)備。
7. When starting, compressed air should be connected to the air storage tank, the control power should be connected, and the ash discharge device should be operated. If there are other equipment in the system, downstream equipment should be operated first.
8、關(guān)機時,在工藝系統(tǒng)終止以后,應(yīng)維持除塵設(shè)備和專業(yè)再次工作中一段時間,以除塵設(shè)備內(nèi)的潮氣和粉塵。
8. When shutting down, after the process system is terminated, the dust removal equipment and profession should be maintained in operation for a period of time to remove moisture and dust from the equipment.
務(wù)必留意的是,在除塵設(shè)備停止工作時,務(wù)必不斷對除塵設(shè)備開展清灰(可以用手動式清灰),將除塵濾袋上的粉塵祛除,防止受潮氣危害而糊袋子。更多相關(guān)事項就來我們網(wǎng)站http://computerguide.cn咨詢吧!
It is important to note that when the dust removal equipment stops working, it is necessary to continuously clean the dust removal equipment (manual cleaning can be used), remove the dust from the dust removal filter bag, and prevent the bag from being damaged by moisture. For more related matters, come to our website http://computerguide.cn Consult!

上一篇:活性炭吸附塔的廢氣處理工作!
下一篇:移動伸縮房的操作要注意哪些操作流程?

  • 服務(wù)熱線: 18563723072
  • 官方微信